In Coins ERP+, each Job analysis is made up of three or four elements: the job code, an optional phase code, the cost code and the cost category. For example:
A1004 | . | 02 | . | ABM1007 | . | MA |
Job | Phase | Cost Code |
| Category |
|
|
See Cost Codes
The maximum length of the entire analysis code, including the full stops and company separator, can be between 19 and 30 characters. (The maximum length can be configured; the default is 19.) There are also limits on the lengths of the individual elements:
Element | Maximum Length | Purpose |
Job code | 8 | Identifies the job (or the development, in a house building context). |
Phase code | 2 | Provides a way of dividing large jobs into smaller units. |
Cost code | Configurable between 8 and 16 characters | Identifies the different types of cost on a job. |
Cost category | 2 | Allows you to analyze costs further into up to six categories, such as labor, materials, and so on. |
Parameters
JC/CAMAXLEN - Contract Costing Analysis maximum length (defaults to 19)
JC/CCMAXLEN - Maximum length of cost code (look at side-frame Help for default values)
JC/JPHOFF - Switch off Contract Phases
JC/XCOINLEN - Exclude company in analysis length check