% Complete Option

A Budget Input Enter By option labelled % Complete is available on Job Status screens for Standard Cost Types in Setup > Setup Maintenance > Standard Cost Types > Forecasting tab and for Job Cost Codes in Administration > Job Cost Codes > Cost Code Maintenance option > Forecasting tab. A code P is used for this % Complete option.

The % Complete option is used to recalculate Forecast At Completion (followed by a Forecast To Complete recalculation completing a new set of values on the row).

For Value rows set to % Complete, the percentage entered is applied to different costs (Actual Costs, Current, or Other Budget Cost).

Standard Cost Types Maintenance

Job Cost Code Maintenance

Rate Option

The Rate option is not disabled if the Budget Input Method is set to Value. When the Enter By % Complete option is selected, the Rate becomes available for updating.


​