Skip to main content

Prevailing Wage - JC Cost Code Maintenance

A
Written by Andy Temple
Updated over 3 weeks ago

An Exclude from Prevailing Wage Schedule Calculations field can be found on the Cost Code Maintenance screen in Job Status > Jobs > Cost Code Maintenance, as shown in JC Cost Code Maintenance. It indicates whether the Cost Code should be excluded from Prevailing Wage Calculations. It is unchecked by default.

JC Cost Code Maintenance

Did this answer your question?