Skip to main content

Job Specific Cost Types - Configuration

A
Written by Andy Temple
Updated over 3 weeks ago

JC parameter JOBCH allows jobs to be configured using Job Specific Cost Types.

Parameter

Description

JC/JOBCH

Allow job specific cost types

Example

As an example of how this parameter is used, consider the following scenario:

  • JC/JOBCH is set to Yes;

  • The option Allow Non-Standard for Cost Type 62 with the description Safety Labor is checked;

  • Cost Type 62 for Job 000007 has non-standard description Safety Labor NON-STANDARD.

In this case, for Job 000007 for Cost Type 62 in the lookups and Payroll Timesheet entry functions, the Job Group and Job Group PR Redirection Info Job 000007 specific description Safety Labor NON-STANDARD will appear instead of the standard description Safety Labor.

Did this answer your question?